Severn Bore Over Bridge 23.01.11
A small group of spectators watched in the cold with anticipation for the bore to arrive. A large swell pushed its way to the bridge, still with force. Even after meeting high water levels I was struck by how the huge volume of water still lifted itself and swayed from side to side as the river twisted and turned its way towards Maisemore Weir.